Leetonia is seeking reimbursement from the Federal Emergency Management Agency for repairs needed
Leetonia is seeking reimbursement from the Federal Emergency Management Agency for repairs needed from summer flooding. (Figures are rounded to nearest dollar.)
Repairs to hiking trails washed out at Cherry Valley Coke Ovens Park, $2,107.
Replacing equipment -- sewage sampler, 3-inch trash pump, sewage grinder, lead pump -- and labor and service charges, sewage treatment plant, $30,923.
Repairs to High Street retention dam, $1,554.
Villagewide miscellaneous cleanup, removal of debris from creeks, street department employee labor costs, $4,097.
Fire department personnel costs, pumping out residential basements, removal of fallen trees, use of fire trucks and pumps, firefighters on standby for downed wires, $5,163.
Fire department equipment replacement, $1,819.
Washington Street repairs to ditches, removing debris, replacing gravel, $3,508.
Replace a 20-foot section of 12-inch culvert pipe that washed out on Ash Street, $1,381.
Madison Street, repairs to 24-inch drain under railroad crossing, inspect with camera system, repair 4-foot sinkhole, $2,010.
Oak and Vine streets, repair embankment erosion and catch basin, remove debris and replace 50 feet of culvert pipe, $1,556.
Retention dam repairs, labor and equipment costs for debris removal, $1,088.
Source: Village of Leetonia
43